I get these emails every week and usually just dismiss them; this week there are a lot of Crozet-specific alerts.
I’ve bolded the Crozet items, which include pothole patching on Crozet Avenue, the closing of Browns Gap Turnpike, road widening of Route 240.
(NEW) Other construction – Expect lane and shoulder closures in the following areas:
- Interstate 64, left lane closed between mile marker 104 and mile marker 105 in the eastbound lanes, Monday through Thursday, 7 p.m. to 5:30 a.m.
- Interstate 64, right shoulder closed between mile marker 105 and mile marker 107 in the eastbound lanes, Monday through Thursday, 7 p.m. to 5:30 a.m.
- Interstate 64, right shoulder closed between mile marker 104 and mile marker 107 in the westbound lanes, Monday through Thursday, 7 p.m. to 5:30 a.m.
(NEW) Pothole patching – Expect mobile, alternating lane closures in the following areas:
- Interstate 64, between mile marker 100 and mile marker 131 in the eastbound and westbound lanes, Wednesday and Thursday, 8 a.m. to 4 p.m.
- Route 240 (Crozet Avenue), between U.S. 250 (Rockfish Gap Turnpike) and Route 1230 (Meadows Drive) in the northbound and southbound lanes, Tuesday, 9 a.m. to 2 p.m.
(UPDATE) Pipe repairs/installation – Expect lane and shoulder closures in the following areas:
- Interstate 64, left lane and left should closed between mile marker 110 and mile marker 111 in the westbound lanes, daily through Thursday, 8 a.m. to 1 p.m.
- Route 750 (Old Turnpike Road), road closed between Route 803 (Goodloe Lane) and U.S. 250 (Rockfish Gap Turnpike) with a signed detour. Drivers should follow message board detour route, Monday and Tuesday, 8:30 a.m. to 4:30 p.m.
(UPDATE) Bridge repairs – Expect lane closures in the following areas:
- Route 676 (Woodlands Road), alternating lane closures with flaggers between Route 743 (Earlysville Road) and Cedar Bluff Road in the northbound and southbound lanes, Monday through Friday, 7 a.m. to 5:30 p.m.
- Route 680 (Browns Gap Turnpike), road closed between Route 240 (Three Notch’d Road) and Route 802 (Old Three Notch’d Road). Drivers heading north on Route 680 should continue west on Route 240 to Route 802 and turn right to rejoin Route 680 north of the work zone, Monday through Thursday, 8 a.m. to 4:30 p.m.
(NEW) Tree trimming – Expect lane closures in the following areas.
- Route 6, (Irish Road), mobile, alternating lane closures between the Nelson County line and Route 20 (Valley Street) in the eastbound and westbound lanes, Monday through Thursday, 8 a.m. to 2 p.m.
- Route 53, (Thomas Jefferson Highway), alternating lane closures with flaggers between Route 1102 (Michie Tavern Lane) and the Fluvanna County line in the eastbound and westbound lanes, daily, 9 a.m. to 3 p.m.
U.S. 29 (Monacan Trail) – Tree removal. Expect alternating lane closures between the Nelson County line and Route 745 (Arrowhead Valley Road) in the northbound and southbound lanes, daily, 7 a.m. to 4:30 p.m.
(NEW) U.S. 250 (Richmond Road) – Roadway improvements. Expect alternating lane closures between Route 179 (Hansens Mountain Road) and Route 1107 (North Hill) in the eastbound and westbound lanes, Tuesday and Wednesday, 9 a.m. to 5 p.m.
(UPDATE) U.S. 250 (Rockfish Gap Turnpike) – Road widening project. Expect lane closures between Birdsall Lane and Route 750 (Old Turnpike Road). The westbound lanes will remain reduced from two lanes to one and the eastbound lane shift will remain in place. This is a long-term closure for the duration of the project. Expected completion date, April, 2024.
Route 20 (Scottsville Road) – Bridge superstructure repairs/replacement. Expect temporary traffic signal with new traffic pattern at Route 708 (Red Hill Road). Route 708 will narrow to one lane for construction on the bridge over the North Fork Hardware River in the southbound lanes, beginning Tuesday at 9:30 a.m. Project completion date, Dec. 2024.