Lots of Crozet Infrastructure Improvements to be Discussed on Wednesday, 7 July

Reading Sean Tubbs’ “Week Ahead” email, which has become one of the very few must-reads for me every week, it looks like there are a lot of things on the Albemarle County Board of Supervisors’ agenda this week.

There is so very much that affects Crozet. Please take a few minutes to read what’s coming up, and if you’re inclined, get involved, and if you’re super-inclined, I’d pay you to write a story about the meeting. Contact me.

Sean serves this up, and then I started digging

Next, there will be an update on transportation projects from Albemarle’s transportation planning manager as well as the administrator of the Virginia Department of Transportation’s Charlottesville residency. (Albemarle report) (VDOT report)

The evening session begins at 6 p.m. and there are three public hearings. In one, $32.7 million in American Rescue Plan Act assistance is to be appropriated to county government ($21.24 million) and county public schools ($11.475 million). Read the details in the staff report. 

In the second public hearing, there is a proposal to designate Route 240 and Route 810 as Virginia Byways. 

“A Virginia Byway designation recognizes a road having relatively high aesthetic or cultural value, and leading to or within areas of historical, natural, or recreational significance,” reads the staff report. “This designation may promote local tourism by providing an awareness of local significance and aesthetic opportunities regionally.”

From the above-linked Albemarle County report

Just searching for “Crozet;” if these interest you, please click through to the report and see the context for each or all of these.

ZMA202000005 Old Dominion Village – Review of the proposal and transportation aspects/impacts of this Neighborhood Model rezoning in Crozet.

SP202000016 Claudius Crozet Park – Staff is reviewing the proposed redevelopment of the Crozet Park Recreational facilities to add an expanded exercise facility and improved pool and associated resources.

21. Crozet Ave/US 250 West Intersection Improvements – This intersection was identified in the Crozet Area Transportation Study and ongoing Master Plan update as currently experiencing failing movements and significant failure in the future. However, it should be noted that this priority ranking was set prior to that Study which showed that the more serious issue in this segment of 250 is the Old Trail/WAHS/US 250 intersection. It is staff’s recommendation that it would be more effective to address that intersection prior to the Crozet Ave intersection. A two-lane roundabout at both the WAHS/Old Trail/250 intersection and the Brownsville-Henley entrance are recommended to address the issues in this segment.

82. I-64/Exit 107 Crozet Park and Ride Lot: This project will construct a park and ride lot at the corner of Patterson Mill Lane and US 250 just south of the I-64 interchange. This lot could potentially be served by both the Crozet Connect and the proposed Afton Express transit lines.

-Crozet Square – This project will reconstruct Crozet Square and Oak St to improve traffic flow and parking. Engineering and design phase are underway, and construction is planned to begin late-2021.

– Library Avenue Extension – Staff has been working closely with the private developer designing this project and VDOT through the engineering and design phase. This has involved numerous public and project team meetings to determine design requirements that meet VDOT standards. The 60% design was submitted to VDOT for review last quarter and the team is working to address some of the issues that VDOT has identified. Construction is expected to begin late-2021.

US 250 West Pedestrian Improvements – This project will construct segments of sidewalk along US 250 West in Crozet from Cory Farms Drive to Clover Lawn Lane and include a new pedestrian crosswalk and pedestrian crossing beacon near Clover Lawn Lane. Construction is expected to begin Summer/Fall 2021.

From the Above-Linked VDOT Report

Route 240/250 Roundabout 

Total estimated cost: $3.5 million
Estimated ad date: Fall 2021
Estimated completion date: Late 2022

Route 240 Bridge Rehabilitation over Lickinghole Creek Project Details

Total estimated cost: $2,210,000
Estimated ad date: June 8, 2021
Est. construction start date: Spring 2

Rte.151/250 Roundabout

Anticipated Construction Start – Summer 2021

One Reply to “Lots of Crozet Infrastructure Improvements to be Discussed on Wednesday, 7 July”

Something to say?